Müller Ice Cap Daily Report Tuesday April 15
Daily Report for the 15 April 2025
Again, a very sunny day with low winds. We continued preparing all details in the drill tent. It just took a long time getting the last things done … balance the tower, terminate the cable, load test the termination, insert a tower holder for the pull out, make the push pole, ……. While all these last details where going on Ali, Etienne, Sofia and Jaime took the skidoo to the shallow drill site and repaired the Axion tent by sewing a ripped zipper at a door opening.
- Spent the
day making all the small last things for the drill trench
-Restored
the Burb (Suburb) shallow drilling site after the weekend winds.
-Assembled
the drill tower and load tested the cable termination
- Got the
drill head ready
-Had two
overflights of a Twin Otter
Dorthe
Dahl-Jensen
Caption: Camp is cozy