Müller Ice Cap Daily Report Sunday May 4
Daily Report for the 3 and 4 May 2025
From the pictures today you might think that we are not working. During the week days we start drilling at 8 am and continue with two shifts until midnight. We shift teams over lunch and dinner so the two team do not see each other much during these days. But in the weekend we stop drilling at 4 pm on Saturday and start again Sunday at 2 pm after Brunch. This is the time all from the camp are together and we enjoy the time together eating pizza, playing games, talking and laughing together.
What we have done:
-Saturday: Drilled 10 runs from 403.54 m to 422.42 m (18.88 m)
-Sunday: Drilled 9 runs from 422.42 m to 440.30 m (17.88 m)
-Logged and O18 sampled bags and ECM from bag 404 to 440
-Received the Twin Otter three times on Saturday (in: 17 drums of drill liquid, food and part of the firn-air cargo, retro: 36 ice cores boxes, empty drums and garbage).
-We also received Julien Saturday.
-Worked on power system for minilogger
-Improved the floor under the kitchen part of the Arctic Oven tents.
Dorthe Dahl-Jensen
Wx at Müller: Changing mostly blue sky with some fog banks on the horizon. Wind between 0 and 8 kn from N, temperatures between -20 to -16 deg C .
Caption: Saturday afternoon in the sun.
Caption: Driller and Loggers resting in the snow.
Caption: Dave Babb nervously watching the Jet play overtime.
Caption: Dave Babb celebrating the Jets win! Onto Round 2!